walls, it is necessary to drill holes at two levels. Apply the product by using an injection machine until the product leaks from the surface of the wall. In both cases (after the completion of the HYDROSTOP WALL application), allow for the treated surface to rest for at least 24 hours and then seal the holes with D-11 SUPER FAST or DS-247,of DUROSTICK. 3. Impregnation The wall must be free of loose sections and dust. Apply at least three successive coats, without any dilution, until saturation. Each coat follows, as long as the previous one is still wet (wet on wet). In cases where hydrostatic pressure exists, first use HYDROSTOP WALL as a primer (double coat), and then apply the waterproofing mortar D-1 of DUROSTICK to seal the walls. Application methods